CITY OF ROCKY MOUNT
The contractor shall provide all labor, materials, equipment, and supervision necessary to construct the Old Mill Road Sewer Pump Station Force Main, including installation of approximately 3,110 linear feet of 14-inch force main piping using PVC and ductile iron, directional drilling, steel casing installation, sewer air release valves, rock excavation (as needed), erosion control, and all related work required for a complete and operational force main system in accordance with the contract documents.