CITY OF RALEIGH
Little Creek Resource Recovery Facility Rehabilitation & Replacement Contract 2: Replacement of disc aerators and drive, valves, gates, denitrification pump and guiderails, in oxidation ditch. Replacement of aerator for jet mixing system in waste sludge day tank and replacement in-kind of existing sludge pump. Installation of new sludge piping to connect waste sludge day tank to truck loadout. Replacement of chem feed and storage including both bulk storage tanks and piping, recirculation pump, chemical metering pumps, new eyewash station and associated tepid water piping with instantaneous water heater. Installation of jet aeration system, associated piping and pumps, blowers, in Equalization Tank No. 1. Installation of mixed liquor and RAS piping to connect Equalization Tank No. 1 to the clarifier distribution box. Installation of drain lines from both secondary clarifiers to drain line to headworks. Installation of precast meter vault on WAS line, installation of new electrically ac