TOWN OF CLAYTON
Construction of Sidewalk improvements along the East Main Street corridor, including installation of new sidewalks on both sides of roadway, grading, drainage and hydraulic features, traffic signal modification, pavement markings, erosion control measures, and coordination with utilities and adjacent infrastructure.