CDPHE - Department of Public Health and Environment
Modification #1 - Addition of the Pre-Bid Sign in sheet. All else remains the same. The purpose of this Request for Proposals (RFP) is to solicit responses from qualified Offerors for the North Clear Creek Water Treatment Plant Collection System Optimization project. The North Clear Creek Water Treatment Plant (NCCWTP) was constructed pursuant to the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA or Superfund), as part of the Central City/Clear Creek Superfund Site. The NCCWTP is financed by the State of Colorado and the United States Environmental Protection Agency. The Contractor will provide qualified engineering and construction personnel to perform the work necessary including design and construction of pipeline projects to optimize the collection system. Sole point of contact for this solicitation is Kristi Gamble, Purchasing Agent, e-mail at [email protected]. Commodity lines: 91360 Construction, Water System/Plants, Main and Service Line Attachments (20): RFP 2027000097 NCCWTP Collection System Optimization.pdf; SBP-6.12 Information for Bidders.pdf; Appendix A Evaluation Forms.pdf; Appendix B SC-9.0 DBGMP Agreement.docx; Appendix B1 SC9.1 DB GMP General Conditions.pdf; Appendix C1 As-builts with overlay survey 6-2013 As-built Set.pdf; Appendix C2 As-builts with overlay survey 11-2013 As-built Set.pdf; Appendix C3 Final_Focused Technical Review_CC-CC_North WTP.pdf; Appendix C4 National Tunnel As-builts Plan 1994.pdf; Appendix C